matchline.studio

Takeoff software · plumbing

Plumbing takeoff software that returns the whole cut list, not a count of symbols.

A plumbing takeoff is fixtures with trim, carriers and drains by tag; pipe by system, size and material in sticks; fittings per bend and tee; hangers at code spacing; valves from the drawings and the spec; insulation from the schedule. We build a system for your supply house or contracting business that reads the set and returns all of it, priced from your file, with every count beside the sheet it came from.

48fixtures and drains read on the office demo, by tag, from the fixture schedule and three plumbing floor plans
2,300 ftof pipe by service, material and size on the same set, measured at sheet scale, overlapping runs merged, rounded to sticks
305elbows, tees, reducers and cleanouts counted at the nodes of the routed network, with 275 couplings and 303 hangers beside them
100%of jobs reviewed by a person before release, every count beside its sheet

What the system reads

Every sheet, held to the schedule and the spec.

The fixture schedule and the Division 22 specification are read before any plan, so each tag on the floor plans is counted against what the job actually calls for: the specified product, the stocked equal you want offered against it, the trim, carrier and drain that go with it. Then the floor plans, risers, isometrics and enlarged plans, each at its own scale.

Enlarged restroom plans are mapped back onto the floor plan by their shared grid labels, so a fixture counted on the enlarged plan lands where it sits in the building, not an approximation of it. On the school demo set that moved every restroom fixture from a few feet off to exact.

Pipe is measured by service and size along the runs, verticals come from the floor-to-floor heights, and if the heights are not on the set the system asks rather than guesses. Fittings are not an allowance: the routed runs form a network, and every node of it is read as what it is, a long sweep or a quarter bend, a sanitary tee or a combination wye, a reducing tee, a reducer, a cleanout at the base of each stack, a transition where cast iron meets PVC at the slab. Couplings follow the stick length and every fitting end, hangers follow the material at code spacing, and all of it prints by service and size beside the pipe.

How it runs

You set the tiers. The system reads the sets. Your people release each job.

  1. 01

    Set up

    Your lines go in as product packs: catalog, rules, the maker’s drawing content, cut sheets, your list price file by version. Your tiers, your quote format, your ERP’s import layout.

  2. 02

    Upload

    Your customer, or your own estimator, drops the drawing set and a bid date on a portal with your logo on it. A receipt goes to both sides.

  3. 03

    Read and review

    The set is read against its schedules and specification. Each count is stored with the page and the region it came from. A person checks every value against its sheet before release.

  4. 04

    Release

    The quote at the right tier, the scope sheet, the submittal, the production files. The price snapshot is locked; later price changes never touch an issued quote.

Who it is built for

Supply houses first. Plumbing contractors too.

For a plumbing supply house, the portal carries your name and your contractors upload to it. The list they get back came from you, at their tier, so the order follows the list. Your counter reviews each job with every count beside its sheet.

For a plumbing contractor, the same system runs under your own name for your own estimators: the set goes in, the cut list, scope sheet and submittal come out, priced from the supply house files you buy against. Nothing changes about who you buy from.

Matchline is a SaaS builder: we build a takeoff-to-quote system for one business at a time and run it under that business’s name. There are no seats and nothing is priced per job. A build fee, then a monthly fee, both in writing before anything starts. A person reviews every job before it is released.

Questions

Asked about plumbing takeoffs.

Does it count from symbols or from the schedule?

Both, and it reconciles them. The fixture schedule says what each tag is; the plans say where each tag sits and how many there are. The count per sheet is listed beside the schedule quantity, and a difference is flagged for review rather than averaged away.

How is pipe measured?

Along the drawn run at the sheet’s scale, by service and size, with verticals from floor-to-floor heights. Lengths are rounded to sticks the way your counter rounds them, and waste prints as its own line at the percentage you set per material.

What about products you do not stock?

The specified product is kept on the line and your stocked equal is placed beside it, both priced. The or-equal table goes into the submittal. Nothing is substituted silently.

What do we provide for the build?

The lines you stock, your list price files, your multiplier per tier, one quote in the format you key today, your ERP’s import layout if you want orders pushed through, and two or three real document sets your customers would upload.

Can we see it on a real set?

The home page shows two placed takeoffs the system read from public bid sets: a three-story office plumbing system and an auditorium seating layout. Ask for a walk-through of a demo system in your trade and we will open one.

Related

Other pages on this.

Talk to us

Tell us how a plumbing list reaches your counter today.

What you stock, how it gets priced, who would upload to a portal under your name, and what you want back. From that we scope a build in writing.

info@matchline.studio
Or tell us here. A person reads it and writes back.
The team that reads it is the team that builds it.