Guide
How to do a metal panel takeoff.
A metal panel takeoff is read from the elevations, not the plans. Panels are made to size, so the takeoff is a list of panels by dimension, not a square-foot total. The trims, flashings, and copings that finish every edge are often worth as much as the panels. The order below keeps both lists honest: elevations and spec first, panels second, openings third, edges fourth, and the support last.
Step one
Read the elevations, the sections, and the specification.
The building elevations show where the panels go, the joint pattern, and the module. The wall sections and details show what the panels attach to, how the corners turn, and how each edge is finished. The specification names the panel system, the material and thickness, the finish, the joint type, and the acceptable makers. Where the drawings include a panel layout or a panel schedule, it is the basis of the count.
Step two
Break each elevation into panels at the module.
Work one elevation at a time. Follow the joint lines on the drawing and list every panel at its width and height, grouping identical panels. Where the drawings give a module but not every joint, lay out the module across the wall from the dimensioned control points and note that the layout is yours. Panels at corners, at the ends of a run, and around openings are the odd sizes, and they are where the count goes wrong.
Step three
Deduct the openings and check the area.
Every window, door, louver, and storefront in a panel wall is a hole in the panel layout. Deduct each one, and list the panels cut around it. Then check the work: add up the panel area per elevation and compare it with the elevation’s overall dimensions less the openings. A difference means a missed panel, a double count, or a dimension that does not close.
Step four
Take the trims, flashings, and copings by the foot.
Every edge of the panel field is finished with a trim: base, head, corners, jambs, sills, transitions to other materials, and the parapet coping. Measure each by the foot and keep each profile separate, because each is a different part. Trims are made in fixed lengths, so add the laps at the joints.
Then the support: the girts, hat channels, or clip system the sections show, by the foot and spacing; the fasteners; and the sealants and closures. Check whether the air and water barrier and the insulation behind the panels are in your scope or another trade’s. Matchline is a SaaS builder: we build a takeoff-to-quote system for one business at a time and run it under that business’s name. There are no seats and nothing is priced per job. A build fee, then a monthly fee, both in writing before anything starts. A person reviews every job before it is released.
How it runs
What changes when a system does the reading.
- 01
Set up
Your lines go in as product packs: catalog, rules, the maker’s drawing content, cut sheets, your list price file by version. Your tiers, your quote format, your ERP’s import layout.
- 02
Upload
Your customer, or your own estimator, drops the drawing set and a bid date on a portal with your logo on it. A receipt goes to both sides.
- 03
Read and review
The set is read against its schedules and specification. Each count is stored with the page and the region it came from. A person checks every value against its sheet before release.
- 04
Release
The quote at the right tier, the scope sheet, the submittal, the production files. The price snapshot is locked; later price changes never touch an issued quote.
Questions
Asked about metal panel takeoffs.
Why not just take the square footage?
Because panels are made to size. A square-foot total cannot be fabricated or ordered, and it hides the odd sizes at corners and openings, which cost the most.
What if the drawings do not show every joint?
Lay out the module from the dimensioned control points, note that the layout is yours, and expect the shop drawings to adjust it.
Are trims really a big part of the cost?
Often, yes. A building with many openings and corners can have as much trim cost as panel cost, and trims are the most commonly undercounted item.
Who handles the insulation and air barrier?
It depends on the project. The specification and the scope letter decide; the takeoff lists it as included or excluded.
What does a takeoff system change?
Who touches the set. The system we build reads the uploaded set and returns the panel list and trims in the maker’s own products and prices, with the sheet cited per line and a person reviewing before release. See the metal panel page.
Related
Other pages on this.
Talk to us
Tell us what you sell against a drawing set.
What you make, how a set reaches you, how it gets priced, and what you want back. From that we scope a build in writing.