Guide
Duct takeoff by the foot.
A duct takeoff lists every straight by size and length, every fitting by type and size, and the hangers, dampers, clamps and accessories a run needs, read off the mechanical sheets so a dealer or contractor can price it and a maker can fabricate or ship it. Fabricated rectangular duct is often priced by the pound; round and clamp-together duct, including dust collection, is priced by the piece and the foot. This page is the by-the-foot method, which is how the catalog sells it.
Step one
Read the schedules and the specification first.
The equipment schedule names the fans, collectors, units and terminals the duct connects, with their airflow and connection sizes. The Division 23 specification sets the pressure class, the gauge by size, the seal class, the material (galvanized, stainless, aluminum, spiral, clamp-together), the hanger spacing and what accessories are required at each equipment connection. For dust collection the spec or the maker’s own sizing sets the velocity, which sets the diameter per branch. Read these before the plan, because they decide what each foot of duct is made of and which fittings are allowed.
Step two
Measure each run per size.
Follow each system from the equipment out to its last terminal or hood. Measure the horizontal runs on the plans at the sheet’s scale and take the verticals from the sections and the floor-to-floor or ceiling heights. A run is a new line every time the size changes, and the size changes where the drawing or the sizing says it does: after each branch for dust collection, at each reducer for supply. Keep the length per size, not a total, because the straight at each diameter is a different catalog item.
Where the sheets give a duct size on the run, use it. Where they do not and the spec says the dealer sizes it, that is a sizing task before the takeoff, and the method used is written down with the result.
Step three
Count every fitting.
Every change of direction is an elbow of a stated angle and radius; every branch is a tee, a lateral or a wye; every change of size is a reducer; every end is a cap or a connection. Each is counted by size and type because each is a catalog item with its own price. Clamp-together duct adds a clamp at every joint and a gasket where the pressure class calls for one; spiral adds couplings; rectangular adds the transverse joints per the pressure class.
Step four
Round to joints, add hangers and accessories, list the questions.
Straights come in fixed lengths from the maker, so each size rounds up to whole joints and the cut is noted. Hangers follow the spec’s spacing per size, with the extra at every fitting and every change of direction. Then the accessories the spec and the equipment require: volume dampers, blast gates, fire dampers at rated walls, access doors, flex connections at the fans, explosion vents and isolation valves where dust collection calls for them. Last, the exclusions and the questions: where the sheets did not give a size, where the height was missing, where the route was ambiguous.
The result is a duct bill the dealer can price from the maker’s catalog line by line, grouped by system and run, with the sheet each length came from. Matchline is a SaaS builder: we build a takeoff-to-quote system for one business at a time and run it under that business’s name. There are no seats and nothing is priced per job. A build fee, then a monthly fee, both in writing before anything starts. A person reviews every job before it is released.
How it runs
What changes when a system does the reading.
- 01
Set up
Your lines go in as product packs: catalog, rules, the maker’s drawing content, cut sheets, your list price file by version. Your tiers, your quote format, your ERP’s import layout.
- 02
Upload
Your customer, or your own estimator, drops the drawing set and a bid date on a portal with your logo on it. A receipt goes to both sides.
- 03
Read and review
The set is read against its schedules and specification. Each count is stored with the page and the region it came from. A person checks every value against its sheet before release.
- 04
Release
The quote at the right tier, the scope sheet, the submittal, the production files. The price snapshot is locked; later price changes never touch an issued quote.
Questions
Asked about duct takeoffs.
By the foot or by the pound?
Fabricated rectangular duct from a sheet-metal shop is often estimated by the pound of metal. Round, spiral and clamp-together duct sold from a catalog is by the piece and the foot. Dealers of a maker’s catalog take off by the foot because that is how the catalog prices it.
Who sizes the duct?
The engineer when the sheets give sizes; the dealer or maker when the spec says the system is sized by the supplier, usually from velocity for dust collection. The takeoff records which, and the method.
How are the fittings counted?
One by one, by type and size. A percentage added to the straight footage is a check on the count, not a count.
What about hangers?
By the spacing the spec gives per size, plus one at each fitting and each change of direction. They are a line in the bill like everything else.
What does a takeoff system change?
Who touches the set. The system we build reads the uploaded set and returns this same bill, every straight per size, every fitting, hanger and accessory, priced from the maker’s catalog at the dealer’s tier, with the sheet cited per line and a person reviewing before release. See the duct page.
Related
Other pages on this.
Talk to us
Tell us what you sell against a drawing set.
What you stock, how a set reaches you, how it gets priced, and what you want back. From that we scope a build in writing.