How to do a plumbing takeoff.
A plumbing takeoff is fixtures with their trim, carriers and drains, pipe by system and size, and the fittings, hangers and valves that go with it, read off the plumbing sheets so a supply house can quote it and a contractor can order it. The order below is the order that catches the most mistakes: schedule and specification first, plans second, pipe third, questions last. It applies by hand, in a PDF tool or in any software.
Step one
Read the fixture schedule and the specification first.
The fixture schedule names every tag on the job (P-1, P-2, L-1, WC-1, MS-1 and so on) with its description, the basis-of-design model, the mounting and the connection sizes for cold water, hot water, waste and vent. Division 22 of the specification names the acceptable manufacturers, the carriers, the trim, the stops and supplies, the trap and drain requirements, and the pipe material by service: Type L copper for domestic water, PVC or cast iron for sanitary and vent, black steel for gas. Read both before any plan, and write down what each tag is made of as a list: fixture, trim, carrier, stop, supply, trap, drain.
If the schedule gives quantities, keep them; they are the number the plan count is checked against. If it does not, the plan count is the only count, and that is worth knowing before you start.
Step two
Count every tag on every plan sheet, and reconcile.
Work one sheet at a time. Mark each tag as it is counted so nothing is counted twice, and keep a count box per sheet: how many of each tag on this sheet. Enlarged toilet-room plans repeat what the floor plan shows, so count from one or the other, not both, and say which. When the sheets are done, add the sheets up and set the total beside the schedule quantity. Every difference is either a drawing error, a schedule error or a miscount, and each one is a question for the engineer, not a judgment call at the counter.
A tag that appears on the plan but not on the schedule is listed as unscheduled and asked about. A scheduled tag that never appears on a plan is listed with a count of zero and asked about too.
Step three
Turn each tag into an assembly.
Each tag becomes a list of parts: the fixture itself, the flush valve or faucet, the carrier if it is wall-hung, the stops and supplies, the trap and the drain, the seat if it is a water closet, the strainer if it is a sink. Multiply the list by the count. This is where the specified model and the equal you stock are set side by side, so the quote can show both. It is also where the hidden cost of a takeoff lives: a water closet with a carrier and a flush valve is six lines, not one.
Step four
Take the pipe by service, material and size.
Pipe is listed by system (cold water, hot water, hot water return, sanitary, vent, storm, gas), then by material, then by size. Measure the horizontal runs on the plans at the sheet’s scale, and take the verticals from the risers and the floor-to-floor heights; if the set does not give a floor-to-floor height, that is a question, not a guess. A run changes size where the drawing says it does, and the length of each size is kept separately because each size is priced separately.
Fittings are counted at every change of direction, every branch and every change of size: elbows, tees, wyes, reducers, couplings, cleanouts. Hangers follow the spacing the spec gives per material and size. Valves are where the drawings put them plus what the spec requires at each fixture group and each riser.
Step five
Round to sticks, add waste, list the questions.
Pipe is sold in sticks: copper and PVC in 20-foot lengths, no-hub cast iron in 10, steel in 21. Each size rounds up to whole sticks, and the waste factor the branch uses is its own line at a stated rate, never buried in the length. Then write the exclusions and the questions: what the drawings did not show, what the spec and the schedule disagreed on, what the scope stops at. A takeoff that lists its questions is worth more than one that silently guessed.
The result is a cut list the counter can price line by line, grouped by tag for the fixtures and by system for the pipe, with the sheet each count came from written beside it. Matchline is a SaaS builder: we build a takeoff-to-quote system for one business at a time and run it under that business’s name. There are no seats and nothing is priced per job. A build fee, then a monthly fee, both in writing before anything starts. A person reviews every job before it is released.
How it runs
What changes when a system does the reading.
- 01
Set up
Your lines go in as product packs: catalog, rules, the maker’s drawing content, cut sheets, your list price file by version. Your tiers, your quote format, your ERP’s import layout.
- 02
Upload
Your customer, or your own estimator, drops the drawing set and a bid date on a portal with your logo on it. A receipt goes to both sides.
- 03
Read and review
The set is read against its schedules and specification. Each count is stored with the page and the region it came from. A person checks every value against its sheet before release.
- 04
Release
The quote at the right tier, the scope sheet, the submittal, the production files. The price snapshot is locked; later price changes never touch an issued quote.
Questions
Asked about plumbing takeoffs.
How long does a plumbing takeoff take by hand?
For a mid-size commercial set, a counter person or estimator typically spends several hours to a day or two: the fixture count is the quick part; the pipe, fittings and hangers are the slow part.
Should I count from the floor plan or the enlarged plan?
One or the other, and say which. Enlarged toilet-room plans are drawn for the detail, not for the count, and counting both doubles the room.
What if the schedule count and my plan count differ?
List both and ask. The schedule is what the job calls for; the plan is what is drawn; the engineer decides which is right. A takeoff should never pick silently.
Do I take off the fittings one by one?
Yes, by size and type, because each is a priced line. Rules of thumb per foot of pipe are a check, not a takeoff.
What does a takeoff system change?
Who touches the set. The system we build reads the uploaded set and returns this same list, fixtures by tag with their assemblies and pipe by system in sticks, priced from the branch’s file at the contractor’s tier, with the sheet cited per line and a person reviewing before release. See the plumbing page.
Related
Other pages on this.
Talk to us
Tell us what you sell against a drawing set.
What you stock, how a set reaches you, how it gets priced, and what you want back. From that we scope a build in writing.