Reference · symbols
Construction takeoff symbols.
Every count in a takeoff starts with a symbol. This page shows the common ones by trade and what each means for the count. Two warnings first: symbols vary from one design firm to the next, and the legend in the set you are bidding always wins over any reference, including this one. Read the legend first, then use this page to know what to look for.
Electrical
Electrical symbols.
Counted by symbol, per sheet, and each one turned into its parts: device, box, ring, and plate.
Plumbing
Plumbing symbols.
Fixtures are counted by tag from the schedule; these are the symbols around them that are easy to miss.
HVAC
HVAC symbols.
Diffusers and grilles are counted by type and neck size from the air device schedule.
Data and communications
Data and communications symbols.
Each outlet symbol’s legend entry says how many cables it gets.
Fire sprinkler
Fire sprinkler symbols.
Heads are counted by type, finish, and temperature rating.
Before counting
The legend always wins.
These are common conventions, drawn simply, and they are not a standard. Design firms change symbols, add letters, and reuse shapes. A triangle can mean a data outlet on one job and a keynote on the next. So read the legend in the set first, list every symbol your trade counts, and count from that list. When a symbol is on the plans but not in the legend, it is a question for the designer, not a guess.
The handbook covers what to do with each count, trade by trade.
Questions
Asked about takeoff symbols.
Are construction symbols standard?
Partly. The National CAD Standard and industry practice give common conventions, but every design firm varies them. The legend in each set is the authority for that set.
What does the triangle mean on electrical or telecom plans?
Usually a data or telecom outlet, with its cable count in the legend. On some sets a triangle is a keynote or revision marker instead, which is why the legend comes first.
What do the letters next to a light fixture mean?
The fixture type from the light fixture schedule. Fixtures are counted by that letter, never as one total.
What if a symbol is not in the legend?
List it and ask the designer. Counting it as your best guess is how expensive mistakes happen.
Can a system count the symbols?
That is part of what we build: a system that reads the uploaded set and returns the takeoff in the business’s own products and prices, with the sheet cited per line and a person reviewing before release.
Related
Other pages on this.
Talk to us
Tell us what you sell against a drawing set.
What you sell, how a set reaches you, how it gets priced, and what you want back. From that we scope a build in writing.