What your contractor gets back
The whole list, not a count of symbols.
The reason a plumber still builds his own list is that nothing built for him returns the thing he actually needs: a cut list the counter can price and he can order from. Fixtures with trim, carriers, drains and specialties grouped by tag. Pipe by system, size and material, rounded to sticks the way the counter rounds it. Fittings per bend and tee, hangers at code spacing, valves from the drawings and the spec, insulation from the schedule. If any of that is missing, he does it again himself, and the portal saved nobody anything.
So the system we build for a supply house returns all of it, in the form your counter keys today, priced at the contractor’s tier from your own price file. Beside it goes the scope sheet: his own plumbing sheets with every counted fixture highlighted in yellow, every measured run in a color per system, a count box per sheet, and a list of what was excluded, so he checks it the way he checks his own work. Then the submittal package, cut sheets stamped by tag with the or-equal table, and a CSV your ERP imports so the released quote becomes an order without re-keying.
Where the drawings do not say, the system does not guess. Verticals come from floor-to-floor heights, and if they are not on the set the contractor is asked. Hangers and waste print as their own labeled lines so the allowance is visible. Copper carries its own validity because its price moves weekly; the rest of the quote keeps yours.