matchline.studio

Guide

How to do a furniture takeoff.

A furniture takeoff turns the tags on a furniture plan into a list of orderable products, each with its options and finishes. The count itself is rarely hard. What makes it hard is that workstations are drawn as typicals, that every option changes the part number, and that a plan mixes new furniture with pieces being reused or bought by the owner.

12 50 00the specification section for furniture, when there is one
per tagevery product on the plan carries a tag
typicalsdrawn once, counted many times, broken into parts
SIFthe order file most dealers enter from

Step one

Read the furniture plans and the schedule first.

Furniture is usually on the interiors sheets, marked I or FF&E, and sometimes in a separate furniture package. The FF&E schedule lists every tag with its product, the manufacturer and series, and the options and finishes. Enlarged plans show the workstation typicals: a drawn layout of one station with every part labeled. A furniture specification, if there is one, names the acceptable makers and the finish standards.

Step two

Count every tag, floor by floor.

Count each tag one floor at a time and keep a count per floor; furniture is delivered and installed floor by floor, so the count is useful that way too. Private offices, conference rooms, and break areas are usually tagged piece by piece. Open office areas are usually tagged by typical: a cluster marked with one typical letter, repeated across the floor.

Step three

Break each typical into parts and multiply.

A typical is one workstation drawn in detail. Break it into every part: work surfaces, supports, screens, storage, power, and accessories, each with its size. Multiply the parts by the number of times the typical appears. Watch for mirrored typicals, which use the same parts but different left- and right-hand versions, and for clusters that share parts between stations, such as a shared screen or a shared leg.

Step four

Capture options and finishes, then sort the scope.

Every option changes the part number and the price: the chair’s arms, base, mechanism, and fabric grade; the work surface’s edge and laminate; the storage’s lock and pull. A takeoff without options is a guess, not a quote. Customer’s own material (COM) and graded-in fabrics are priced differently, so note which applies.

Then sort every line into new, reused, and owner-furnished. The result is a list the dealer can price and enter, usually as a SIF file, with the part number, the options, and the floor for every line. Matchline is a SaaS builder: we build a takeoff-to-quote system for one business at a time and run it under that business’s name. There are no seats and nothing is priced per job. A build fee, then a monthly fee, both in writing before anything starts. A person reviews every job before it is released.

How it runs

What changes when a system does the reading.

  1. 01

    Set up

    Your lines go in as product packs: catalog, rules, the maker’s drawing content, cut sheets, your list price file by version. Your tiers, your quote format, your ERP’s import layout.

  2. 02

    Upload

    Your customer, or your own estimator, drops the drawing set and a bid date on a portal with your logo on it. A receipt goes to both sides.

  3. 03

    Read and review

    The set is read against its schedules and specification. Each count is stored with the page and the region it came from. A person checks every value against its sheet before release.

  4. 04

    Release

    The quote at the right tier, the scope sheet, the submittal, the production files. The price snapshot is locked; later price changes never touch an issued quote.

Questions

Asked about furniture takeoffs.

What is a SIF file?

A standard interchange file that carries part numbers, options, and quantities. Most contract furniture dealers enter orders from one, so a takeoff that ends in a SIF saves retyping.

How are workstation typicals counted?

Count how many times each typical appears, break one typical into every part, and multiply. Check for mirrored versions and shared parts between stations.

What if the schedule does not list options?

List the question. A chair without its arms, base, and fabric grade cannot be priced or ordered.

What is COM?

Customer’s own material: fabric the client supplies. The chair is priced without fabric, and the yardage is a line of its own.

What does a takeoff system change?

Who touches the set. The system we build reads the uploaded set and returns the takeoff in the dealer’s own lines and prices, ready for order entry, with the sheet cited per line and a person reviewing before release. See the furniture dealer page.

Related

Other pages on this.

Talk to us

Tell us what you sell against a drawing set.

What lines you carry, how a set reaches you, how it gets priced, and what you want back. From that we scope a build in writing.

info@matchline.studio
Or tell us here. A person reads it and writes back.
The team that reads it is the team that builds it.